Plant Bowen Civil Package
J.M. Wilkerson Construction Co., Inc. worked as a subcontractor for J.S. Alberici Construction to perform the foundation cap installation for the SCR and balanced draft conversion for units 3 and 4 at Georgia Power’s Plant Bowen in Cartersville, GA.
JMW was responsible for concrete material and placement, reinforcing steel material and placement, anchor bolt material and placement and structural excavation and backfill.