East Conway Dam
J.M. Wilkerson Construction Co., Inc. was selected as the General Contractor for modifications to the East Conway Dam and Stream located in Atlanta, Georgia.
This early earthen dam and lake had become silted in and was in need of removal and restoration. JMW‘s scope of work included a controlled release of all existing water through an installed spillway, restoration of the original stream bed and installation of structural fill suitable for new building construction where lake areas once occupied. This small but challenging project required both experience with dam construction/removal as well as stream restoration and heavy civil construction.