Walton County Bridge
J.M. Wilkerson Construction Co., Inc. was the general contractor for the construction of over 4,382 feet of Highway 81 in Walton County, as well as the construction of a new 300 foot long bridge and approaches on SR-81 over the Alcovy River beginning west of Riverglen Drive and extending east of Jack Pittman Road.
This project required over 100,000 cubic yards of excavation, including the 65,000 cubic yards of rock that was excavated. JMW self-performed all substructure and superstructure concrete including, but not limited to, footings, pile caps, columns, caps, end-walls, wing-walls, diaphragms, bridge decks and barrier walls. Additionally, we self-perform the installation of piling and the erection of precast beams.